| Activity | Unit | Total Qty | Completed This Period | Cumulative Completed | % Complete | |----------|------|-----------|----------------------|----------------------|-------------| | Conduit rough-in (floor 4) | LF | 3,000 | 1,200 | 1,200 | 40% | | Cable tray installation (corridor B) | LF | 500 | 200 | 500 | 100% | | Panelboard installation (floor 2) | No. | 6 | 2 | 6 | 100% | | Lighting fixture rough-in (floor 3) | No. | 200 | 80 | 80 | 40% |
Remarks:
Prepared By: [Name] MEP Project Engineer Signature: _________________
Approved By: [Name] Project Manager Signature: _________________
| Location | Activity Description | Unit | Planned Qty | Completed Qty | % Complete | Remarks | | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | Basement | Cable Tray Installation (LV) | LM | 300 | 285 | 95% | Finishing by tomorrow | | Level 1 & 2 | Conduit Rough-in for sockets | No. | 120 | 120 | 100% | Completed - Ready for pulling | | Level 6 | DB (Distribution Board) Mounting | No. | 6 | 2 | 33% | Slow due to access issues | | External | Underground Earthing Grid | LM | 500 | 500 | 100% | Tested. Megger reading: OK |
Electrical Photos Summary: [Completed cable tray in basement - tagged and clean] / [Earthing pit Megger test display]
| Activity | Unit | Total Qty | Completed This Period | Cumulative Completed | % Complete | |----------|------|-----------|----------------------|----------------------|-------------| | Chilled water pipe installation (floor 2–3) | LF | 2,500 | 300 | 1,800 | 72% | | Ductwork fabrication & installation (floor 4) | LF | 1,200 | 450 | 450 | 37.5% | | AHU installation (units 1–4) | No. | 4 | 0 | 2 | 50% | | Duct insulation (floor 1) | SF | 8,000 | 2,000 | 8,000 | 100% |
Remarks: