Thyssenkrupp Levant Stair Lift Installation Manual Top -

The manual lists unique requirements for the top landing:

Unlike bottom installations—which often utilize a factory-standard footrest or a slight upward sweep for clearance—the top of the Levant system usually requires field modification to suit the specific landing dimensions. thyssenkrupp levant stair lift installation manual top

If the unit uses a dedicated top charging station (common in specific Levant iterations): The manual lists unique requirements for the top

In a standard stair lift installation, the rail system begins at the bottom floor and terminates at the top floor. However, when the top of the stairs has no floor space—such as a landing that opens directly onto a wall, a narrow hallway, or a door that swings out over the top step—the rail must be terminated before the obstruction. This is the "Top Mount." This is the "Top Mount

In this configuration, the carriage (the moving seat unit) parks on a horizontal or slightly inclined rail section positioned above the last full step, not on the landing floor itself.