Standard Construction Specifications Part 3 Abu Dhabi

03301 MATERIALS A. Concrete blocks shall conform to Abu Dhabi Municipality standards regarding thermal insulation and density. B. Mortar shall consist of cement, lime (optional), and sand mixed in proportions specified (typically 1:4 to 1:6 cement:sand ratio by volume).

03302 EXECUTION A. Blocks shall be laid in a running bond pattern unless specified otherwise. B. Jointing: Joints shall be tooled to a concave finish. No "furrowing" of bed joints is permitted. C. Control Joints: Provide control joints every 6m or as shown on architectural drawings to control thermal cracking. D. Ties: Wall ties shall be provided at 450mm vertical spacing and 900mm horizontal spacing to connect leaves of cavity walls.


3.8.1 General

3.8.2 Testing & Commissioning

In Abu Dhabi, Part 3 does not stand alone. Contractors must cross-reference: standard construction specifications part 3 abu dhabi

| Document | Relevance to Part 3 | |--------------|--------------------------| | ADIBC (2021) | Structural loads, fire resistance ratings for walls/doors | | Estidama Pearl Rating System (V2) | Material sustainability (e.g., recycled content in flooring, low-VOC paints) | | QCC Abu Dhabi (Quality & Conformity Council) | Approved product lists for waterproofing, paints, tiles | | Abu Dhabi Civil Defense (ACD) | Passive fire protection specifications (e.g., intumescent coatings) |

Compliance with SCS Part 3 is mandatory under: 03301 MATERIALS A


Based on 2023–2024 Abu Dhabi municipality site audits, these are the top three Part 3 violations:

error: Content is protected !!